Electric buses and charging on route

Still with regards to the 30 units of electric bus that will be delivered in the next months will have 200 kWh battery capacity and will be charged at the route’s end stops (through ABB fast charging stations) and in the depot. Volvo will provide all maintenance for both the vehicles and their batteries at a fixed monthly cost.

In Malmö, since mid-December 2018, thirteen 7900 Electric have been operating on line 7. Also these vehicles are deployed by the public transport company Nobina. They are equipped with fast charging systems and are charged at the final stations of the route. Uddevalla has also ordered four Volvo 7900 Electrics.